Skip to content
Polished concrete corridor floor beside glass offices and workstations in a civic office building

Veterinary Clinic and Kennel Floor Coatings in Utah

Urine, hosing, disinfectants and claws are hard on bare concrete. A sealed, textured coating keeps runs and treatment rooms clean, dry and free of soaked-in odor.

  • Rating

    4.9 on Google

    From 198+ Google reviews

  • Experience

    10+ years

    In Utah since 2016

  • Coverage

    Licensed & insured

  • Installers

    Same crew

    Installed by the same crew that's been with Elevated since day one

What a kennel or clinic floor has to handle

Animal urine is acidic and soaks into bare concrete, where it leaves stains and an odor that cleaning alone cannot remove.

Kennel runs are also hosed down and disinfected every day, so the floor is wet much of the time.

Claws scratch softer finishes, nervous animals slip on smooth floors, and treatment and grooming rooms add hair, blood and cleaning chemicals. Floors at drains and along kennel walls usually show damage first.

  • Urine that stains and holds odor in concrete
  • Daily hosing and strong disinfectants
  • Claws scratching the surface
  • Wet floors where animals and staff can slip

What we recommend and why

Kennel runs and wash areas that are hosed often with hot water are a good fit for urethane cement, which handles constant moisture, heat and cleaning chemicals.

A flake or quartz system is a strong choice where washdown is lighter, since the broadcast texture gives paws and shoes more grip.

Exam rooms, lobbies and offices usually do well with a flake system, which hides scratches and wear and cleans with a mop. Topcoats are chosen for chemical and stain resistance against the clinic's disinfectants.

  • Urethane cement for heavy hot-water washdown
  • Quartz or flake for kennel runs and grooming
  • Flake for exam rooms, lobbies and offices

How the install works around the animals

Animals have to be out of any area being prepped and coated, and away from curing odors.

Boarding facilities often work in sections, moving animals to one wing while another is coated, or scheduling around slower boarding periods.

Most bids include a site visit (some are bid from plans or an RFQ), and every bid comes in writing with the scope. Clinics often have treatment rooms done after hours or over a weekend.

Prep and concrete testing

Concrete that has absorbed urine for a long time needs more than grinding.

Contaminated areas are cleaned and treated, and badly saturated concrete may need to be removed so odor does not come back through the new floor.

Kennel slabs are usually sloped to drains, and prep keeps that slope so water still runs off. Moisture is tested, since a slab that is hosed daily and sits on grade can carry a lot of it, and the coating is detailed up the base of walls where hosing splashes.

Safety and cleaning

Texture is the main safety choice in animal areas: enough grip for paws and wet boots, but not so rough that it is hard to hose clean.

Different texture can be used in runs, wash areas and exam rooms.

A sealed floor lets disinfectants work on the surface instead of soaking into concrete. Rinsing after disinfecting keeps residue from building up and making the floor slick.

  • More texture in runs and wash areas
  • Squeegee standing water toward drains
  • Rinse disinfectant residue

Maintenance and lifespan

  • Daily hosing and disinfecting is exactly what these floors are built for, so the routine stays the same.

  • Watch the areas along kennel gates and around drains, where wear and standing water show first.

  • Scratches from claws are mostly cosmetic on a flake or quartz floor.

  • When the topcoat dulls, it can be refreshed by section while animals use the rest of the building.

Process

How a bid works

Request

Send the building type, size and timing, and any plans or photos.

Site visit

For most bids, we look at the slab and agree the work window; moisture is tested when the slab needs it and listed in the bid. Some are bid from plans or an RFQ.

Written bid

Every bid comes in writing with the scope: the system, the prep and the areas covered.

Install

Planned around your hours. Before you reopen, we go over the cure schedule: when you can walk, load and drive on it.

Concrete grinder on a freshly polished floor beside water tanks in a mechanical room

Who installs your floor

Installed by the same crew that's been with Elevated since day one

Every bid comes in writing with the scope: the system, the prep and the areas covered.

  1. Most bids start with a look at the slab; some are bid from plans or an RFQ.

  2. Every bid comes in writing with the scope.

  3. Planned around your hours.

FAQ

Veterinary & kennels: questions

Straight answers to the questions we hear most.

Will a coating get rid of urine odor in an old kennel?

Sealing the concrete stops new urine from soaking in, but odor already deep in the slab has to be treated or removed during prep. That is why contaminated areas are assessed first.

Is a coated floor too slippery for dogs?

A smooth, glossy floor can be, which is why kennel floors are usually given a flake or quartz texture. The texture is set so animals have grip and the floor still hoses clean.

Can dog claws scratch an epoxy floor?

Claws can leave light surface marks on any finish. A textured flake or quartz floor hides them well, and the topcoat can be renewed when it dulls.

Where do the animals go during the work?

Animals stay out of the area being coated until it has cured and aired out. Most facilities move animals to another wing or schedule around a slower period.

Still have a question?

Ask us directly, or send the plans and we will quote it.

Request a Bid
Crew spreading a light grey coating across a large aircraft hangar floor

Request a bid

Ready for a bid?

Send your project details or plans. We reply within 1 business day.