Skip to content
Glossy light grey epoxy floor running the length of a basement build-out, with the wall framing still open

Build-Out & Tenant Improvement Flooring in Utah

Moving into a new space or remodeling one? Floors bid to your budget and scheduled around your build-out.

  • Rating

    4.9 on Google

    From 198+ Google reviews

  • Experience

    10+ years

    In Utah since 2016

  • Coverage

    Licensed & insured

  • Installers

    Same crew

    Installed by the same crew that's been with Elevated since day one

Recently coated: a 17,000 sq ft commercial floor, delivered through a general contractor

What a build-out floor has to handle

A build-out, or tenant improvement, means moving into a new space or remodeling one, and the floor often starts as an unknown slab, with old adhesive, patches, trenches and cracks left by past tenants. The new floor has to suit how the space will be used, work with the concrete that is there and fit both a budget and a construction schedule.

A change of use raises the stakes. A space moving from retail to food service or light industrial may need a floor that handles water, heat or chemicals the old one never saw.

  • Hidden cracks, patches and trenches under old flooring
  • Adhesive and coatings from earlier tenants
  • Other trades working on top of a new finish
  • A new use with different demands than the last one
Polished concrete floor running from an open office area into a long hallway

What we recommend and why

Matching the system to each area, instead of one premium system everywhere, keeps the floor in line with the budget.

Polished concrete is a cost-effective, durable finish for offices and retail spaces with a sound slab.

Where the slab is patched or uneven-looking, an epoxy or polyaspartic flake floor covers it with a durable textured finish. Storage and back-of-house rooms that mainly need dust-proofing can take a sealed concrete finish at a lower cost.

How the install fits the build-out schedule

In most build-outs the floor goes in after demo and the heavy trades, and before fixtures, shelving and furniture, though some prep can happen earlier.

We work with your GC on those dates.

Cure time depends on the system, the temperature in the space and when other trades and move-in need the floor. Where trades must keep working after the floor is down, a breathable covering protects the finish.

Prep and concrete testing

The slab is easiest to judge once the old flooring is off, so the assessment often happens after demo.

Old adhesive, coatings and flooring are removed, then the slab is diamond-ground to a sound surface.

Plumbing and electrical trenches, cracks and joints are patched so the new floor sits flat. A slab that was covered for years can hold moisture, so it is tested when it needs it, listed in the bid, to show which system will bond.

Safety, code and cleaning for the new use

The floor should be specified for what the space will become, not what it was.

A future restaurant needs a cleanable, nonabsorbent kitchen floor with slip texture in wet areas, while an office or showroom mainly needs a finish that is easy to keep clean.

Entrances are where most slips and tracked-in grit start, so walk-off mats belong in the plan before opening day. Cleaning products should match the finish, with a pH-neutral cleaner suiting most polished and coated floors.

Maintenance and lifespan

  • A build-out floor lasts longest when it is protected during the last weeks of construction and cared for from opening day.

  • The lifespan depends on the system chosen, the traffic and how consistently the cleaning routine is kept.

  • Planning where furniture and equipment will sit helps avoid early scratches and dents.

  • Cover the finished floor with a breathable protection while trades are still working
  • Clean with a pH-neutral cleaner suited to the finish once the space opens
  • Put walk-off mats at entrances before the business opens
  • Use pads or protectors under furniture and equipment

Process

How a bid works

Request

Send the building type, size and timing, and any plans or photos.

Site visit

For most bids, we look at the slab and agree the work window; moisture is tested when the slab needs it and listed in the bid. Some are bid from plans or an RFQ.

Written bid

Every bid comes in writing with the scope: the system, the prep and the areas covered.

Install

Planned around your hours. Before you reopen, we go over the cure schedule: when you can walk, load and drive on it.

Concrete polisher on a commercial floor at the foot of a stairwell, with a crew member on the stairs

Who installs your floor

Installed by the same crew that's been with Elevated since day one

Every bid comes in writing with the scope: the system, the prep and the areas covered.

  1. Most bids start with a look at the slab; some are bid from plans or an RFQ.

  2. Every bid comes in writing with the scope.

  3. Planned around your hours.

Keep reading

Systems, problems and guides for this work

FAQ

Build-outs & tenant improvements: questions

Straight answers to the questions we hear most.

Can you work to a fixed budget?

Yes. Give us the number up front and we can scope a system to fit it, or tell you if the space needs more.

When should the floor go in during a build-out?

Usually after drywall, paint and overhead work, and before fixtures, shelving and furniture. We work with your GC, or with you if you run the build, to place the floor in the schedule.

Can you take up the old flooring?

Converted spaces hide surprises: old adhesive, tile, patched slabs and moisture. We don't remove tile; we do remove glue and old coatings.

We're opening a restaurant in a former retail space. What changes?

Kitchen and wet areas need a seamless, cleanable floor with a cove base; the front of house can be a decorative system.

Can the flooring be priced before demo is finished?

A first price can be based on the visible slab, the planned use and the size of the space. Conditions found after the old flooring comes off, such as trenches or heavy adhesive, are then confirmed so the scope reflects the real slab.

Does a landlord need to approve the floor?

Many leases cover changes to the building, including floors, and some ask for the finish to stay or be removed at move-out. Checking the lease early avoids surprises at the end of the term.

Can different rooms in a build-out get different finishes?

Yes. A typical layout pairs polished concrete or a coating in customer areas with a sealed finish in storage and a wet-area system where water is used.

Still have a question?

Ask us directly, or send the plans and we will quote it.

Request a Bid
Squeegee spreading freshly poured grey coating over a prepared hangar slab

Request a bid

Ready for a bid?

Send your project details or plans. We reply within 1 business day.