How a commercial floor coating project works
Every commercial floor follows the same path: see the slab, test it when it needs it, put the bid in writing, then install around your hours. Here is what happens at each step and what we need from you.
From first call to care.
Every step of a commercial floor project, from the first call and the site visit to the cure schedule and caring for the floor.
Request a Bid- Step 01
First call
You tell us about the building, the floor and the timing you are working toward.
- Step 02
Site visit and measure
Most bids include a site visit (some are bid from plans or an RFQ).
- Step 03
Concrete and moisture testing
The slab's surface is checked before a system is chosen, and moisture is tested when the slab needs it, listed in the bid.
- Step 04
Written bid and scope
Every bid comes in writing with the scope: the system, the prep and the areas covered.
- Step 05
Scheduling around your operations
The work is booked into the window that suits the business: nights, weekends, a shutdown or one zone at a time.
- Step 06
Prep
The concrete is ground with dust extraction to open the surface and remove old sealers and contaminants.
- Step 07
Install
The system goes down coat by coat, with texture, flake or color added as the scope calls for.
- Step 08
Cure and return to service
The floor cures before traffic returns, first to foot traffic, then rolling loads, then vehicles or chemicals.
- Step 09
Before you reopen
Before you reopen, we go over the cure schedule: when you can walk, load and drive on it.
- Step 10
Care
Cleaning a coated floor the right way protects the finish: sweep up grit and clean with a neutral cleaner.
FAQ
How it works: questions
Straight answers to the questions we hear most.

Do we have to close the business for the install?
Usually not. Work can be phased by zone, done at night or on weekends, or scheduled for a planned shutdown so the business keeps running. After-hours work is priced accordingly.
When is moisture testing needed?
When the slab needs it, for example a new slab or one that was covered for years, and it is listed in the bid. Moisture coming up through a slab is a leading cause of coating failure, so testing first means any mitigation is planned and priced before work begins.
Who do we deal with during the project?
The written bid names the work, so everyone is working from the same plan.
Can you work with our general contractor?
Yes. On build-outs and new construction, the floor is scheduled around the other trades, and plans and specifications can be shared at the bid stage.